Heacock Street Improvements from Iris Avenue to Gentian Avenue
         Sequel  Contractors,  Inc.  has  completed the  installation  of  concrete  sidewalk  on  the  east  side  of  Heacock
         Street from Revere Place to Gentian Avenue. The contractor continues the roadway improvements on the
         east side of  Heacock Street with pavement scheduled to be constructed in early July 2017.  Construction will
         then be switched to the west side of the street in August 2017 and be completed in October 2017 .

























         Cycle 6 ADA Pedestrian Ramp Improvements
         CT&T  Concrete  Paving  Inc.  continues  with  the  construction  of  the  Cycle  6  ADA  Pedestrian  Ramp
         Improvements project.  Twelve (12) access ramps and a bus bay have been reconstructed to meet American
         with Disabilities Act (ADA) requirements. The locations of the completed ramps are at:

            Cottonwood Avenue and Cheshire Drive

            Cottonwood Avenue and Heacock Street


            Perris Boulevard and Filaree Avenue

            Perris Boulevard and John F. Kennedy Drive.