Edgemont Neighborhood Pavement Rehabilitation

               The contractor started the construction in November 2016, of the pavement rehabilitation on Dracaea Avenue
               (from west of Edgemont Street to Day Street), Bay Avenue (from Day Street to Frederick Street), Abington
               Place,  and Berkshire Lane. The pavement rehabilitation work includes either slurry  seal application or
               removal/replacement of the existing asphalt concrete surface. The work also includes the reconstruction of a
               number of driveway approaches along Dracaea Avenue to match the new pavement. Pavement rehabilitation
               will enhance safety and drivability while extending the service life of the roads.  Construction is scheduled to
               be completed by the end of November 2016.
               Alessandro Boulevard Entry Monuments

               Work  has  begun  on  updating the  two  City  entry  monuments  located at  the  intersection  of  Alessandro
               Boulevard and Historic Route 395. Van Holland Concrete will be performing the work.  The scope of work
               consists of building short, stucco monument signs on top of the existing concrete walls, refacing the concrete
               walls  with stone treatment, providing new  “Moreno Valley” lettering, and  placing new  color  City seals.
               Construction will take place in November and be completed by December 2016 (weather permitting).  Shown
               below are a “before” photo and a rendering of the proposed update.


















               Land Development

               Private Watercourse

               The Land Development Division sent out over 800 “Reminder to Maintain Private Watercourse” notices at
               the end of September.  These notices are sent every year to private property owners that have a privately
               maintained watercourse through their property.  The required compliance date is October 14, 2016 with
               inspections to occur by the end of October.  Maintenance of these private watercourses is critical to ensure
               storm water will flow across the City as designed.  If there are any questions regarding the notices, please
               contact the Land Development Division at 951.413.3120

               Special Districts

               CFD Bonds Sold with Favorable Interest Rates
               The City’s Financing Team was able to secure interest rates of 2.00%-3.25%, with a term of 30-years, for
               $3,265,000 in bonds.  The bonds were sold for Improvement Area No. 1 of Community Facilities District No. 7
               (CFD).  Proceeds from the bonds will reimburse the developer for flood control facilities installed and accepted
               by the Riverside County Flood Control District in 2009.  Construction of the improvements allowed for the
               development of property within the Improvement Area (between Cardinal Avenue and Nandina Avenue, and