• Install new light fixtures at various park sites
• Plant roses at TownGate Center courtyard
• Spray weeds at ball fields
• Trim palms at Sunnymead Park
• Install 290 recycle trash containers at all park sites (ongoing)
• Install new weather-based irrigation controllers at Gateway Park (ongoing)
• Install corrals at Equestrian Center (ongoing)
• Paint dugouts at March Field Park
• Plant trees and shrubs in Zone 1 and 2 parks (70% complete)
• Check ball field lights at all sports fields (ongoing)
• Grind concrete raisers on walkways at various park sites (ongoing)
• Groom all trails; add DG to some areas
• Fertilize all parks and sports fields not renovated
• Install new tee markers
• Repair pump at John F. Kennedy Memorial Park
• Repairs fences on all south trails (50% complete)
• Grind high areas in south parks
• Fertilize Lasselle Sports fields
• Remove wood boards along Cactus Trail (75% complete)
• Install new light fixtures at various park sites (ongoing)
• Spray weeds at ball fields
• Trim palms at Sunnymead Park (ongoing)
• Verticut greens and fairways, topdress and seed golf course
• Aerify fairways, seed and top dress at golf course
• Aerify all parks and fertilize
• Add fibar to Woodland, Parque Amistad, and Pedrorena Parks’ playgrounds
• Add rubber and sand to playgrounds at Celebration and Vista Lomas Parks
• Groom and add rubber to March Soccer Field
• Plant Redwood tree at CRC
• Seal coat restroom floors at Weston Park
• Install LED light fixtures at Morrison Park restroom buildings
• Install 290 recycle trash containers at all park sites (ongoing)
• Install new weather-based irrigation controllers at Gateway Park (ongoing)
• Install corrals at Equestrian Center (ongoing)
• Paint dugouts at March AFB
• Plant trees and shrubs in Zone 1 and 2 parks (70% complete)
• Perform ball field light checks at all sports fields (ongoing)
• Grind concrete raisers on walkways at various park sites (ongoing)
• Groom all trails; add DG to some areas
• Install new tee markers
• Repair pump at John F. Kennedy Memorial Park
• Repair fences on all south trails (50% complete)
• Grind high areas in south parks
• Fertilize Lasselle Sports Park fields
• Remove wood boards along Cactus Trail (75% complete)
• Install new light fixtures at various park sites (ongoing)
• Trim palms at Sunnymead Park (ongoing)
• Verticut greens and fairways, topdress and seed golf course
• Aerify fairways, seed and top dress at golf course
• Repair Celebration Park water feature