Parks Maintenance Division
               Park Maintenance staff completed the following projects:

                   •  Sprayed weeds at Cottonwood Golf Course
                   •  Aerated and fertilized Morrison Park and Sunnymead Park ball fields
                   •  Graded and leveled infields at Morrison and Sunnymead Parks
                   •  Changed out quick couplers on ball field infield at Morrison Park
                   •  Removed lips on infield arcs at Morrison and Sunnymead Parks
                   •  Installed push bar on northeast gate along with new closing hinges at Community Park soccer fields
                   •  Installed rock and dedication sign for Dominic Durden at Hidden Springs Trail
                   •  Repaired Cactus Trail
                   •  Installed solar tube at Lasselle Sports Park
                   •  Aerified Lasselle Sports Park football fields
                   •  Winterized splash pad and made repairs and renovations
                   •  Removed all weeds at south parks
                   •  Painted, trimmed, and wood bonded beams at El Potrero West Park
                   •  Made irrigation repairs on mainlines at Victoriano and Pedrorena Parks
                   •  Installed upgraded Calsense 3000 controllers at Community Park
                   •  Installed new irrigation pump at Shadow Mountain Park
                   •  Planted roses at TownGate Community Center courtyard
                   •  Fertilized all parks and sports fields not renovated
                   •  Sprayed weeds at ball fields
                   •  Aerified and fertilized all parks
                   •  Planted Redwood tree at CRC
                   •  Installed LED light fixtures at Morrison Park restroom buildings

               The following projects are in progress:
                   •  Install 290 recycle trash containers at all park sites (ongoing)
                   •  Install new weather-based irrigation controllers at Gateway Park (ongoing)
                   •  Install corrals at Equestrian Center (ongoing)
                   •  Paint dugouts at March Field Park
                   •  Plant trees and shrubs in Zone 1 and 2 parks (70% complete)
                   •  Repair Cactus Trail (75% complete)
                   •  Perform ball field light checks at all sports fields (ongoing)
                   •  Grind concrete raisers on walkways at various park sites (ongoing)
                   •  Groom all trails; add DG to some areas
                   •  Fertilize all parks and sports fields not renovated (50% complete)
                   •  Install new tee markers
                   •  Repair pump at John F. Kennedy Park
                   •  Repair fences on all south trails (50% complete)
                   •  Grind high areas in south parks
                   •  Install solar tube at Lasselle Sports Park
                   •  Aerify Lasselle Sports Park football fields
                   •  Fertilize Lasselle Sports Park fields
                   •  Remove wood boards along Cactus Trail
                   •  Winterize splash pad and make repairs and renovations
                   •  Remove all weeds at south parks
                   •  Paint, trim, and wood bond beams at El Potrero West
                   •  Repair irrigation on mainlines at Victoriano and Pedrorena Parks
                   •  Install upgraded Calsense 3000 controllers at Community Park
                   •  Install new irrigation pump at Shadow Mountain Park