Parks Maintenance Division
Park Maintenance staff completed the following projects:
• Sprayed weeds at Cottonwood Golf Course
• Aerated and fertilized Morrison Park and Sunnymead Park ball fields
• Graded and leveled infields at Morrison and Sunnymead Parks
• Changed out quick couplers on ball field infield at Morrison Park
• Removed lips on infield arcs at Morrison and Sunnymead Parks
• Installed push bar on northeast gate along with new closing hinges at Community Park soccer fields
• Installed rock and dedication sign for Dominic Durden at Hidden Springs Trail
• Repaired Cactus Trail
• Installed solar tube at Lasselle Sports Park
• Aerified Lasselle Sports Park football fields
• Winterized splash pad and made repairs and renovations
• Removed all weeds at south parks
• Painted, trimmed, and wood bonded beams at El Potrero West Park
• Made irrigation repairs on mainlines at Victoriano and Pedrorena Parks
• Installed upgraded Calsense 3000 controllers at Community Park
• Installed new irrigation pump at Shadow Mountain Park
• Planted roses at TownGate Community Center courtyard
• Fertilized all parks and sports fields not renovated
• Sprayed weeds at ball fields
• Aerified and fertilized all parks
• Planted Redwood tree at CRC
• Installed LED light fixtures at Morrison Park restroom buildings
The following projects are in progress:
• Install 290 recycle trash containers at all park sites (ongoing)
• Install new weather-based irrigation controllers at Gateway Park (ongoing)
• Install corrals at Equestrian Center (ongoing)
• Paint dugouts at March Field Park
• Plant trees and shrubs in Zone 1 and 2 parks (70% complete)
• Repair Cactus Trail (75% complete)
• Perform ball field light checks at all sports fields (ongoing)
• Grind concrete raisers on walkways at various park sites (ongoing)
• Groom all trails; add DG to some areas
• Fertilize all parks and sports fields not renovated (50% complete)
• Install new tee markers
• Repair pump at John F. Kennedy Park
• Repair fences on all south trails (50% complete)
• Grind high areas in south parks
• Install solar tube at Lasselle Sports Park
• Aerify Lasselle Sports Park football fields
• Fertilize Lasselle Sports Park fields
• Remove wood boards along Cactus Trail
• Winterize splash pad and make repairs and renovations
• Remove all weeds at south parks
• Paint, trim, and wood bond beams at El Potrero West
• Repair irrigation on mainlines at Victoriano and Pedrorena Parks
• Install upgraded Calsense 3000 controllers at Community Park
• Install new irrigation pump at Shadow Mountain Park